  1. Wont have to have a dehumidifier if they don't use the ice in the summer either. It takes about 11 days after the concrete cures to bring the slab down to ice making temperature levels. You have to slowly bring a new slab down to avoid cracks. Next season they will be able to have the slab to ice making temperatures in about a day.
    1 point
  2. I have heard that is exactly what the plan is. Rink 2 will primarily be used as practice ice and additional overflow if needed for games/tournaments and what not. It will only be an ice sheet from Sept-March so they can continue to host other sports and events during the summer months.
    1 point
  3. I have heard the new system them are using to place teams isn't working very well so I won't be shocked if they are very delayed
    1 point
  4. funny folks still waste money on this. its not what it use to be..... A or low level AA hockey.
    1 point